SlimLine 38 Windows

You are here

SlimLine 38 Windows

A Step By Step Guide
  

5. ASSEMBLY OF GEORGIAN BARS IN FIXED GLAZING AND VENTS
6. RUBBERING OF PROFILES AND GEORGIAN BARS
7. RUBBERING REBATE AND CENTRAL GASKET
8. GLASS SUPPORTS
 

Preparations


 

 

 

 

Assembly of frames and transoms

  • Apply and secure T-brackets
  • Assemble transoms
  • Preparations for corner connection
    • Crimp or screw frame assembly
  • Seal internal corners

Assembly of vents, including drainage

  • Preparations for corner connection
  • Check top or bottom side of vent
  • Crimp or screw frame assembly
  • Tighten and secure mitres

Preparations of georgian bars

Assembly of georgian bars in fixed glazing and vents

  • Preparations
  • Drill holes for primary bars
  • Preparations for secondary bars
  • Fit and mount bars
  • Drill holes for secondary bars

Rubbering of profiles and georgian bars

  • Self-adhesive tape
  • Outer glazing gaskets
  • Acoustic gasket

Rubbering Rebate and central gasket

  • Rebate gasket
  • Central gasket

Glass supports

BACK TO OVERVIEW